Shipping policy

Standard Build, Electrical Configuration & Pre-Shipment FAT

All 27 standard-configuration YIXING labeling machines, industrial tape applicators, and 3D carton erectors listed on shop.primelabeler.com are assembled and tested at our Shipai Town, Dongguan workshop (~3,000 m²) prior to export crating.

  • Lead Time: Standard builds typically complete assembly and testing in 3–7 business days (7–15 business days with voltage adaptation or custom jigs).
  • Export Voltage: Listed EXW pricing reflects 220V 50Hz base builds. 110V 60Hz North America export wiring is available upon confirmation at order placement.
  • Pre-Shipment FAT: Every unit undergoes a 300–500 pcs continuous live run prior to plywood crating. Buyer-appointed SGS or TÜV pre-shipment FAT and IEC 60204-1 electrical inspection are supported on request.
  • Freight Terms: Online prices are estimated EXW Dongguan base unit references; air freight, sea LCL/FCL, CIF, or DDP freight is finalized by destination port/ZIP.